4.4 First Article Tests
First Article Test Sample Tested by the Supplier - The supplier shall
4.4.1
subject the ejector to the preproduction test specified in Table I and addition-
al tests as required by the Model Specification. The number of test articles
and the order of tests shall be in accordance with Table I.
TABLE I. First Article Test Program.
NOTES:
Inspections 2, 3, 4 and 5 shall be repeated at the end of the tests
a.
for each test article prior to disassembly and inspection.
b.
Inspections 6, 7 and 8 shall be conducted in the order listed.
c.
A third test article is optional for sharing the inspections of test
article 2.
4.4.2 Test Report - After the supplier completes the preproduction tests, he
shall prepare a preproduction test report and furnish copies of the report as
required to the procuring activity with the following minimum information: