MIL-P-85315
30.3 Parenthetical sentences, phrases, and words are included herein for the
guidance of the pump manufacturer for insertion of proper information and data
related thereto, in connection with the preparation of the model specification.
Parenthetical statements shall not be copied verbatim in the model specification.
30.4 The specification number shall be the number assigned by the pump manufac-
turer.
When revisions are made, they will be designated by the use of a dash
and a letter following the number, with a revision date therefore, which shall
be shown on page 1 only. Only the specification number, and the revision suffix
letter, if applicable, shall be shown on the subsequent pages.
30.5 For purposes of permitting -preliminary evaluation of a proposed ejector
design, or for release of approved ejector performance characteristics in connec-
tion with an aircraft or aircraft equipment design competition, the ejector
manufacturer may submit a preliminary model specification to serve until super-
seded by a complete coordinated model specification which will be required for a
production contract.
30.5.1 The preliminary model specification shall be prepared in accordance with
the requirements stipulated herein.
40.0 MODEL SPECIFICATION
40.1 The form and description of the model specification follow:
(Number and title - The number and title shall be shown as follows.)
SPEC NO.
(DATE)
(A) REVISED
(B) REVISED
(DATE)
MODEL SPECIFICATION
PUMP, EJECTOR, FUEL BOOSTER, AIRCRAFT
(Insert service type and model designation if assigned)
(NAME OF CONTRACTOR)
(CONTRACTOR'S MODEL DESIGNATION)
15
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business