MIL-P-5238C
4.3.1 Test report. The test report, covering all details of the First Article
inspection shall be prepared in accordance with MIL-STD-831. The test report
shall include, in addition to the description of the test samples, the assembly
and cross-sectional drawings of the pump assembly, and of any details discussed
in the test report. The required description of the test apparatus may be
abbreviated by including sketches and photographs to provide a clear understand-
ing of each test set-up.
4.3.2 Test samples for the procuring activity. All items subjected to test
shall be available for submittal to the procuring activity for inspection and
test for a period of at least 2 years following submittal of the test report.
4.4 Quality conformance inspections. The quality conformance inspections shall
consist of individual tests and such additional sampling test as required by
the acceptance test plan.
4.4.1 Individual tests. Each assembly shall satisfy specification requirements
in the following individual tests:
a.
Examination of product
(4.5.4)
Break-in Run
b.
(4.5.3)
c.
Calibration
(4.5.5)
d.
Leakage
(4.5.4)
Insulation Resistance
(4.5.20).
e.
4.4.2 Sampling tests. Additional periodic inspections, based upon a produc-
tion lot size or upon calendar intervals shall be in accordance with the
approved acceptance test plan.
4.5 Test methods
4.5.1 Test fluid. Where not otherwise specified, the test fluid shall be
the principal fluid the pump shall experience in use.
4.5.2 Examination of product. All pump assemblies shall be inspected and
certified to be in accordance with the applicable drawings and specifications,
including all requirements of section 3 for which tests. are not appropriate..
The unit shall be clean and free of any contaminants, oil, grease, preserva-
tives or any other material not specified.
10
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business